> REFERENCES   > Aerospace   > Lufthansa Technik   > LOS! 2010   

 

LHT_Text

INPUT ENGINEERING

 

We are on „Mountain 2010.” We live the values of LHT. LHT values continue to exist into the future. The dialogue picture method was already in use in 2006 – in the form of an enormous boat.  Also at that time the “LOS! Beaver” was on board – “LOS!” was above all the main theme regarding production. What does the future hold? Which lean principles and methods will lead up to the summit of Mount Industry Leadership in 2014?

DIALOGBILD_LHT_LOS!2010_KUNDE


Grosse

Thomas Grosse
Project Engineer
Lufthansa Technik AG
Aircraft Engineering, FRA WE 1

Lufthansa Technik employs lean principles to achieve their strategic goals.  The dialogue picture provides communication of the upcoming changes and dialogue with employees.  In the dialogue picture, the current market environment is shown which contains the strategic goals as well as the elements of the LHT Lean Program.

 LOS! 2006 – OUR WAY TO A SUCCESSFUL FUTURE

DIALOGBILD_LHT_LOS!2006

A dialogue picture was already being used in 2006 to communicate the corporate vision.  The overriding concept was of a large ship that slowly but forcibly navigated its way through the market.  “We are all sitting in the same boat” – the symbol shows how closely the individual ranges are interconnected and how a smooth operational process depended on sufficient communication and cooperation.

 LOS! 2010 – OUR WAY UP MOUNT INDUSTRY LEADERSHIP

DIALOGBILD_LHT_LOS!2010

In der Fortsetzung, dem Dialogbild „LOS! 2010“, hat das Schiff sein Etappen-Ziel erreicht.
Es liegt an der Küste vor Anker. Nun gilt es, den Mount Industry Leadership zu erklimmen.
Doch welcher Weg ist der erfolgreichste?

 THE DEVELOPMENT

DIALOGBILD_LHT_LOS!2010_01 DIALOGBILD_LHT_LOS!2010_02 DIALOGBILD_LHT_LOS!2010_03 DIALOGBILD_LHT_LOS!2010_04

 

 

Impressum        Kontakt        Kundenlogin